The removal of the gas meter and capping the supply feeder pipework downstream of the Emergency Control Valve (ECV).

We manage the co-ordination of site visits with the client and the client’s representatives as well as EAL’s meter installation partners, all of which are Ofgem Accredited Meter Installers (OAMI’s).  

It is necessary to purge all downstream pipework either during or prior to meter removal in order to make the system safe. Any removed meter will normally be removed from the site and be made available to its owner in accordance with MAMCoP requirements, unless there are physical constraints preventing this. Removal of downstream pipework can be undertaken by prior arrangement.

EAL will manage the provision of all required data to the relevant industry parties.