Speedy Results for Renewable Energy Project

With time short for this project, Energy Assets Utilities had to work efficiently and effectively to produce a quotation for the 500kVA export the development required.

Programme

The wind turbine development in Cranford, East of Kettering, was a project for Farm Wind with short deadlines that relied on the unanimous support of the local community. Without community consent, the turbines  could not have been built. With time short for this project, Energy Assets utilities (EAU) had to work efficiently and effectively to produce a quotation for the 500kVA export the development required.

Our Solution

In addition to being a leading independent connections provider for large scale solar energy sites, EAU has also been an essential part of numerous high profile wind turbine developments. Once full consent of the local community had been obtained, EAU installed 200 metres of cable in trenches provided by the client in a manner that ensured the levels of disruption were minimal. We then designed and installed a bespoke 11kV metering substation. The cable and metering substation were then adopted by WPD.

Contact us