Electricity Automated Meter Reader upgrade

The meter upgrade will be completed by one of Energy Assets qualified engineers and the work will take approximately 60 minutes.  Electricity to only be switched off for about 15-20 minutes.

Important information about the electricity being switched off on the upgrade day:

  • Please inform your IT / Operations Departments that your electricity will be switched off for a 15-20 minutes on the agreed upgrade date.
  • Please ensure that you have support telephone numbers, security codes and passwords for any equipment available in case they are triggered when the electricity is turned off.
  • If your premises are located inside a shopping centre it may be necessary to provide a work permit or method statement and a risk assessment. Please let us know in advance of the appointment if these are required by contacting us on 01506 405 445 or email MopPlanning@energyassets.co.uk
  • Prior to the interruption to the power supply, all electrical equipment needs to be switched off and unplugged.
  • Please ensure you know where the electricity meter is and that there is nothing blocking access to it, if the meter is in a locked area / cabinet please ensure that you have access keys.

Important information to provide us:

  • The address where the electricity meter is located.
  • Who the contact person will be on the day or provide the details (telephone/email) of who the Engineer should ask for on arrival?
  • Is the meter in an easily accessible location or would the engineer require a key or code to gain access to it?
  • Is the meter above 2 meters from the ground (will ladders be required)?
  • Do we require any additional authorisation to carry out the works or are there any site security procedures we should be aware of?
  • Is there parking available on site for a transit sized vehicle? If not is public parking available nearby?
  • Are there any other special requirements for consideration prior to the installation visit – – work permit, method statement, risk assessment etc.
  • Computer server Systems
  • Cash Register and Card reading equipment
  • All computer ancillary equipment
  • All Alarm systems
  • CCTV
  • Televisions
  • Audio Equipment
  • Recording Equipment
  • Telephone Systems
  • Boilers

Electricity SMETS2 meter upgrade  

The meter exchange work will be completed by one of Energy Assets experienced engineers and will take approximately 60 minutes.  We expect the electricity to only be switched off for about 15-20 minutes.

Important information about the electricity being switched off on the exchange day:

  • Please inform your IT / Operations Departments that your electricity will be switched off for a 15-20 minutes on the agreed exchange date.
  • Please ensure that you have support telephone numbers, security codes and passwords for any equipment available in case they are triggered when the electricity is turned off.
  • If your premise(s) is located inside a shopping centre it may be necessary to provide a work permit or method statement and a risk assessment. Please let us know in advance of the appointment if these are required buy contacting us on 01506 405 445 or email MopPlanning@energyassets.co.uk
  • Prior to the electricity being switched off, all electrical equipment needs to be switched off and unplugged.
  • Please ensure you know where the electricity meter is and that there is nothing blocking it. If the meter is in a locked area or in a cabinet, please make sure you have access keys.
  • Please let us know if ladders are required to reach your meter.

 