Rapid Response For Fast Food Outlet

Rapid Response For Fast Food Outlet

Restaurant was back in operation within two hours…

Programme

Energy Assets Group had recently taken over the role of MOP (Meter Operator) for a portfolio of meters on behalf of an energy supplier when a fast-food shop reported a power outage.

An EA engineer was immediately despatched and was able to identify the problem and quickly exchange the legacy meter with an advanced AMR-enabled meter. At the same time, the engineer balanced the load appropriately across the 3 phase supply – correcting the excessive load on one phase that had caused the original problem.

Now the restaurant owners are not only assured of a more reliable operating environment, they also benefit from remote monitoring of meter performance and automatic meter reading.

Outcome

As part of its service commitment, Energy Assets aims to get businesses back on supply inside a three hour window – in this case, the restaurant was back in operation within two hours.


A proven track record

Back in operation after 2 hours.

The engineer balanced the load appropriately across the 3 phase supply – correcting the excessive load on one phase that had caused the original problem.

100% fix of the excessive load issue.


Watford Football Club

A major gas infrastructure to support a redevelopment at Watford Football Club Programme The alteration and upgrading of the existing gas service meter and outlet pipework in advance of demolition work. This had to be completed with minimal disruption to […]

READ MORE

Speedy Results for Renewable Energy Project

With time short for this project, Energy Assets Utilities had to work efficiently and effectively to produce a quotation for the 500kVA export the development required. Programme The wind turbine development in Cranford, East of Kettering, was a project for Farm […]

READ MORE
National Gas Emergency ServiceElectricity fault?